当前位置:首页-企业动态

精密度是电脑弹簧机必备的标签

来源:http://www.diannaothj.com   

  纵观近些年,电脑弹簧机的发展由机械式向自动化、数控化进行转变,并逐渐取代机械式。 弹簧机是伴随各种各样弹簧的出现而逐渐发展起来的一种生产和制作弹簧的机器设备,弹簧的丰富和精密度的提高相应的对弹簧机的要求也越来越高。

  In recent years, the development of computer spring machine from mechanical to automatic, CNC change, and gradually replace mechanical. The spring machine is a kind of machine equipment which is developed and produced gradually with the appearance of all kinds of springs. The improvement of the spring's abundance and precision makes the spring machine more and more demanding.

  一.扭簧机空运转试验前的准备工作:

  A torsion spring machine. Air operation test preparation:

  1、扭簧机空运转试验必须在基础完全干固后方可进行。

  1, torsion spring machine empty running test must be based on a solid rear can be completely dry.

  2、检查扭簧机各部位有无异物,各联接件和紧固件有无松懈。

  The 2 part, check the torsion spring machine there is no foreign body, the connecting piece and the fasteneris loose.

  3、检查扭簧机各润滑管路,液压管路连接是否正确,所用润滑和液压用油量是否合适,油位是否恰当,润滑部位润滑是否到位。

  3, check the torsion spring machine lubrication pipeline, hydraulic pipe connection is correct, the lubrication and hydraulic oil quantity is appropriate, the oil level is appropriate, lubrication part lubrication is in place.

  4、扭簧机附属设备在空运转前需进行单独的检查试验,以验证其性能是否达到规定要求。

  4, torsion spring machine auxiliary equipment before the transfer of air, need to carry out a separate inspection test, in order to verify whether its performance meets the specified requirements.
电脑弹簧机生产厂家

  二.扭簧机空载试运转:

  Two. No-load test run of torsion spring machine:

  1、首先启动扭簧机的转动,检查各部件是否正常。电压是否稳定,检查完毕转动Z轴之后检查Z轴转动是否平稳,无扭动等现象。出厂前无负载运转必须空转4-8小时。

  1, start rotating torsion spring machine, check whether the various components of the normal. Whether the voltage is stable, check the rotation of the Z axis, check whether the Z axis rotation is stable, no twisting and so on. Before running without load must be idle for 4-8 hours.

  2、检查扭簧机是否有接地线,防止漏电点情况发生,以免造成不必要的发生。

  2, check the torsion spring machine whether there is ground wire, to prevent leakage point occurrence, so as not to cause unnecessary occurrence.

  3、把控制器调为手动操作,反复使用Y轴运动,看Y轴运行是否平稳和轻松。

  3, the controller is adjusted to manual operation, repeated use of Y axis movement, to see whether the Y axis running smoothly and easily.

  4、在扭簧机空运转试验过程中检查下列项目:

  4, the torsion spring machine air operation during the test to check the following items:

  a:传动齿轮及轴承等各润滑点的润滑充分,各密封部位密封良好。

  The lubrication of the lubrication points such as the transmission gear and bearing of the a: is sufficient, and the sealing parts are well sealed.

  b:运转中不得有较大的振动和周期性噪声。

  B: operation may not have noise vibration and periodic large.

  本文的精彩内容来自电脑弹簧机详细内容请点击我们的官方网站:http://www.diannaothj.com谢谢您的到来!

  The exciting content of this article comes from the computer spring machine, please click on our official website: http://www.diannaothj.com thank you for coming!


上一篇:降低弹簧机械零件磨损速度的事宜
下一篇:保持无凸轮弹簧机精度长久的措施
弹簧机 电脑弹簧机 联系我们